翻訳と辞書 |
USS Brevard (AK-164) : ウィキペディア英語版 | USS Brevard (AK-164)
USS Brevard (AK-164) was an commissioned by the U.S. Navy for service in World War II. She was responsible for delivering troops, goods and equipment to locations in the war zone. ==Commissioning== The ''Brevard'' was laid down on 2 September 1944 at Richmond, California, by Kaiser Cargo Inc., under a Maritime Commission contract (MC hull 2109); launched on 18 November 1944; sponsored by Mrs. C.S. Wieringa, wife of the out-fitting superintendent at the builders’ yard; delivered to the Navy and commissioned on 19 February 1945, Lt. Paul J. Wild, USNR, in command. “In orderly procession,” Lt. Wild later wrote, “came ‘Fitting-Out Availability’ at Treasure Island, California, loading of stores and material at Oakland, California, two weeks of shakedown in San Pedro, California, and post-shakedown availability at San Pedro.” Following those post-commissioning details, ''Brevard'' loaded cargo at San Francisco, California, and put to sea for Hawaii on 8 April.
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「USS Brevard (AK-164)」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|